
LIRR Mainline Expansion Construction (3TC). The LIRR Main Line Expansion from Floral Park to Hicksville reduces congestion and delays, improves safety, and creates a more reliable rail network. The project includes 9.8 miles of new third track, the elimination of eight street-level grade crossings, modifications to seven rail bridges, ADA improvements and enhanced stations, third-party utility re

BART Project Management support for M&E project.
The scope of the service is to provide project management and controls, reporting and other services to accelerate strategic and preventative maintenance across BART’s infrastructure. Areas of support include the following:
1. Project management support throughout all stages including planning, design, procurement and construction.
2. Leverage techn

AMTRAK Speed Rail Construction.
Develop 30%, 60%, 90% and IFB constructability schedule for various Amtrak stations across the U.S. The projects consist of the construction of track work, underground utility relocation, station building, platform, stormwater drainage, stations architectural work, electrical replacement, sidewalk, walkway and stairs construction.

Responsible for project management/construction management scheduling and costing, strategic master planning, forecasting, resource allocation, baselining, and contract/bidding management.
Project experience includes both simple and mega engineering, procurement, and construction projects. EPC projects ranged from $14 million to over $4 billion. Performs CPM scheduling, bid schedule development, st






We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.